EFFLUENT MANAGEMENT (EN12)

Wastewater from process is being treated with best available physio-chemical methods and recycled in the process. Wastewater from coke plant is treated biologically where organic pollutants are oxidized and decomposed by microorganisms. Consumption of water (7.00 m3/tss) and discharge of wastewater (5 m3/tss) are much lower than the legal norms of 20 m3/tss & 16 m3/tss respectively.

The levels of total pollutant discharge in the wastewater streams have reduced considerably at various locations as shown in the boxes. The absolute effluent quantities and pollution loads from the Steel Works are furnished in the box. Noamundi, Joda Mines & Collieries do not discharge any overflow from the Slime/Tailing Dams. Quality parameters for treated sewage are furnished in SO-1 under Section-6.0 (Water Management).
  
  

 
Absolute quantities of pollutants & effluents from
Steel Works
  
Parameter 01-02 02-03 03-04
Effluent generation
(million m3)
10.23 10.4 904
Total Suspended Solids (tonnes) 597.84 628.76 656.78
Oil & Grease
(tonnes)
19.15 27.48 20.10
Ammonia
(tonnes)
104.06 77.35 71.26
Cyanide
(tonnes)
0.996 0.91 0.83
Phenol
(tonnes)
0.16 0.89 1.25

  
Ammonia level (mg/l) in Susungharia Drain
  


Zero Discharge Slime Dam-Noamundi

EN13 SIGNIFICANT SPILLS

There was no reported incidence of any oil spill or chemical spillage in the organization during reporting period.
  